Machines, PLCs, MES and ERP speaking one clean data model instead of five parallel truths.
Most plants do not have a machine problem, they have an interface problem. Legacy controllers, a newer MES layer and a reporting stack that nobody fully trusts coexist for years, and every new cell adds another island.
We integrate at the protocol level — OPC UA, Modbus, EtherNet/IP, MQTT — and normalise the signals into a single tag model with ownership, units and quality flags defined once. Historian writes, MES transactions and supervisory dashboards all read from that same model.
Integration work is delivered with an explicit dependency map, so a controller change in one area does not silently break a report in another.
“They rebuilt the integration layer a previous integrator left half finished. Six months on, the whole line reads from one data model and the shift team trusts it.”
“The first cell took fourteen weeks. The second took three, because the platform had been standardised properly the first time.”
“We asked for a plant-wide dashboard and got a single trusted alert instead. That alert has caught four failures this year.”
Tell us which line is limiting output. We reply within two working days with a first assessment and a short list of the data we would need.