Condition signals turned into a maintenance plan the team can actually execute on Monday morning.
A vibration alarm is not a maintenance strategy. We work from failure history first, identify the two or three degradation paths that genuinely matter for each asset class, and instrument only what distinguishes them.
Models are trained per asset family, validated against known failures, and then wired into the existing planning routine so a work order is proposed with a lead time the team can staff.
We deliberately keep the first release small. A single asset family with a trusted alert beats a plant-wide dashboard nobody opens.
“They rebuilt the integration layer a previous integrator left half finished. Six months on, the whole line reads from one data model and the shift team trusts it.”
“The first cell took fourteen weeks. The second took three, because the platform had been standardised properly the first time.”
“We asked for a plant-wide dashboard and got a single trusted alert instead. That alert has caught four failures this year.”
Tell us which line is limiting output. We reply within two working days with a first assessment and a short list of the data we would need.