We design, simulate and commission autonomous cells that keep producing without an operator standing next to them.
Every deployment starts on the floor, not in a slide deck. Our engineers map the real constraint of a line — cycle time, changeover frequency, tolerance stack, operator knowledge — and only then choose the platform that can hold it.
From there we build a digital twin of the cell, run the failure modes against it, and commission in staged cutovers so production never stops for a long dark period. Handover includes a runbook, a training loop for the shift team, and a measured baseline you can compare against after ninety days.
Typical programmes run twelve to twenty weeks. Most clients start with a single bottleneck cell and extend to the second and third once the first is stable.
“They rebuilt the integration layer a previous integrator left half finished. Six months on, the whole line reads from one data model and the shift team trusts it.”
“The first cell took fourteen weeks. The second took three, because the platform had been standardised properly the first time.”
“We asked for a plant-wide dashboard and got a single trusted alert instead. That alert has caught four failures this year.”
Tell us which line is limiting output. We reply within two working days with a first assessment and a short list of the data we would need.