Automation design, integration and optimisation for plants running three shifts. We start with the constraint that actually limits output, then engineer around it.
Four programmes, one engineering team. Most clients start with a single bottleneck and extend once the first cell is stable, so each engagement is written to be repeated.
“They rebuilt the integration layer a previous integrator left half finished. Six months on, the whole line reads from one data model and the shift team trusts it.”
“The first cell took fourteen weeks. The second took three, because the platform had been standardised properly the first time.”
“We asked for a plant-wide dashboard and got a single trusted alert instead. That alert has caught four failures this year.”
Tell us which line is limiting output. We reply within two working days with a first assessment and a short list of the data we would need.